Globex Mining Enterprises Inc.: Gold Intersection Extends Ironwood Zone Closer to Surface
Wed Jul 23, 1:00 AMROUYN-NORANDA, QUEBEC--(Marketwire - July 23, 2008) - GLOBEX MINING ENTERPRISES INC. (TSX: GMX.TO)(FRANKFURT,STUTTGART,BERLIN,MUNICH,XETRA:G1M)(OTCQX: GLBXF) ("Globex") and QUEENSTON MINING INC. (TSX: QMI.TO)(FRANKFURT,STUTTGART:QMI) ("Queenston") are pleased to update shareholders on drilling at our 50% - 50% Wood-Pandora Joint Venture located in Cadillac Township, Quebec.
Further to a news release dated July 9, 2008, in which the joint venture announced assay results on four diamond drill holes, one additional hole, W08-73, has recently intersected the Ironwood gold deposit assaying 7.55 g/t Au over a true width of 9.59 metres including 11.73 g/t Au over a true width of 5.69 metres. This intersection is 30 metres above previous hole W06-22 which assayed 22.6 g/t Au over a true width of 11.63 metres. Details of the assay results from hole W08-73 are outlined in the table below.
-------------------------------------------
Core True
From To Length Width Au
(m) (m) (m) (m) (g/t)
-------------------------------------------
115.0 129.75 14.75 9.59 7.55
-------------------------------------------
including:
-------------------------------------------
121.0 129.75 8.75 5.69 11.73
-------------------------------------------
including:
-------------------------------------------
121.0 124.0 3.00 1.95 19.22
-------------------------------------------
and:
-------------------------------------------
126.75 129.75 3.00 1.94 13.25
-------------------------------------------
Globex and Queenston are pleased with this new shallow intersection which extends the gold zone towards surface above the previously updated NI 43-101 inferred mineral resource of 243,000 tones grading 17.26 g/t Au as outlined in a report by R. Pressacco, M.Sc., P.Geo. and summarized in a press release dated March 3, 2008. Six additional holes were drilled for geotechnical purposes away from the ore body in order to test the area of a proposed ramp. Assays are pending from these holes. Metallurgical test work being undertaken at SGS Services Inc. should be completed shortly and will provide the joint venture with appropriate metallurgical options as regards treatment methods. This press release was written by Jack Stoch, P. Geo. President and CEO of Globex in his capacity as a Qualified Person (Q.P.). Forward Looking Statements: Except for historical information this News Release may contain certain "forward looking statements". These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the Company's expectations and projections. A more detailed discussion of the risks is available in the "Annual Information Form" filed by the Companies on SEDAR at www.sedar.com ContactsJack Stoch, P.Geo., Acc.Dir., GLOBEX MINING ENTERPRISES INC.
President and CEO
819-797-5242
819-797-1470 (FAX)
info@globexmining.com,
www.globexmining.com



